
DRY NETWORKS
Our experience in dry networks (electrical and telecom) has already been around for ten years, with the first projects for MB Télécom and EDF: equipment at Saulce (04) - 200km of trenches for laying optical fiber, construction site for the Canal de Provence.
Our field of intervention has since gone beyond regional limits with the Moselle Fiber projects for Sogea / Axians and the sites in the South-West with Lacis.
We recently carried out the Fiber Camargue project with Circet / Orange, for which we installed 155 km of optical fiber in micro-trenches over 2 years, including the installation of the chambers.
Our fleet of machines dedicated to mechanized laying consists of 2 Risa RT200 and Dalen 180 slicers with cutting capacities from 0.13 to 0.35 m, and two slicers specially equipped with a 0.30 chain.
These machines are completed with a loading belt and a cable reel and can work in offset.
We can currently deploy 2 teams of 6 to 7 autonomous and specialized people.



